Electrical Panel Upgrade
Posted: Thu Jul 07, 2022 9:11 pm
Well today, the electricians upgraded the house from a 100 amp setup to a 200 amp set up. The only thing I don't like or understand is that main box outside only has one breaker now versus the six we had previously, which were as follows.
1) Main House
2) Dryer
3) AC
4) Heater
5) Stove, turned off as we have a gas stove.
6) Shed
So when I was adding additional electrical circuits to the shed, I would flip the breaker marked shed and kill the shed. Now if I flip the breaker, I kill the whole damn house. I might put a shut off switch in the shed, next to my shed breaker panel box. I have a little electrical work to do in there, then I'll insulate, drywall, and paint the inside of the shed, plus put a new window unit it it. Then paint the outside to match the house.
We've been out of the house for 130 days so far. The main issue is the program is micromanaging the whole process, causing delays due to the unavailability of inspectors. The contractor has lost close to a 100 days of work out of the 130 days due to waiting for inspections, plus while waiting for approval to move forward with the structural repairs after the structural issue was found. That was 3 weeks for the approval to do the repairs, then 3 weeks waiting for an inspector to sign off on the repairs afterwards, so 6 weeks lost just to replace the bad studs.
Stress along with this blasted Florida summer heat is literally killing me, I've had a few Angina episodes (Not to be confused with Vagina episodes) over the last few weeks.....So I'm trying not to stress and hiding from the heat as much as possible!
I'm ready to go home.....!
1) Main House
2) Dryer
3) AC
4) Heater
5) Stove, turned off as we have a gas stove.
6) Shed
So when I was adding additional electrical circuits to the shed, I would flip the breaker marked shed and kill the shed. Now if I flip the breaker, I kill the whole damn house. I might put a shut off switch in the shed, next to my shed breaker panel box. I have a little electrical work to do in there, then I'll insulate, drywall, and paint the inside of the shed, plus put a new window unit it it. Then paint the outside to match the house.
We've been out of the house for 130 days so far. The main issue is the program is micromanaging the whole process, causing delays due to the unavailability of inspectors. The contractor has lost close to a 100 days of work out of the 130 days due to waiting for inspections, plus while waiting for approval to move forward with the structural repairs after the structural issue was found. That was 3 weeks for the approval to do the repairs, then 3 weeks waiting for an inspector to sign off on the repairs afterwards, so 6 weeks lost just to replace the bad studs.
Stress along with this blasted Florida summer heat is literally killing me, I've had a few Angina episodes (Not to be confused with Vagina episodes) over the last few weeks.....So I'm trying not to stress and hiding from the heat as much as possible!
I'm ready to go home.....!