
The tractor with the streetcar loaded on N 4th Ave.

En route to the new shop. We had two trucks tailing the load-mostly doing a traffic check to prevent idiots from getting where we didn't want them to get. As you can see, there were numerous overhead obstacles to be avoided and the guy driving the tractor was a new guy I've never seen before.

Streetcar on the unloading ramp. I had to back the bus out so that the equipment needed to get the streetcar inside the building could get access. Naturally, that part of the job took the longest. After the wrecker left, the number of volunteers quickly dwindled to four. Three old heads and a new guy, who had to leave when family duty called. It took us all afternoon to get the car in the building (it derailed twice in the process) but we did it. First derailment was due to the curved piece of track being half an inch wide. After rerailing the car, we regauged the track which took about an hour. The reason that the track was out of gauge was that the track gauge that was used to space the rails was itself out of gauge. It was within railroad industry tolerances, but freight railroad wheels have a different profile and wider tread than street railway wheels.



